Sponsored by the Balloon Council
Current Law

653.1. (a) No person shall sell or distribute any balloon which is constructed of electrically conductive material, and filled with a gas lighter than air without:

(1) Affixing an object of sufficient weight to the balloon or its appurtenance to counter the lift capability of the balloon.
(2) Affixing a statement on the balloon, or ensuring that a statement is so affixed, that warns the consumer about the risk if the balloon comes in contact with electrical power lines.
(3) A printed identification of the manufacturer of the balloon.

(b) No person shall sell or distribute any balloon filled with a gas lighter than air, which is attached to an electrically conductive string, tether, streamer, or other electrically conductive appurtenance.
(c) No person shall sell or distribute any balloon which is constructed of electrically conductive material and filled with a gas lighter than air, which, is attached to another balloon constructed of electrically conductive material and filled with a gas lighter than air.
(d) No person or group shall release, outdoors, balloons made of electrically conductive material and filled with a gas lighter than air, as part of a public or civic event, promotional activity, or product advertisement.
(e) Any person who violates subdivision (a), (b), (c), or (d) shall be guilty of an infraction punishable by a fine not exceeding one hundred dollars ($100). Any person who violates subdivision (a), (b), (c), or (d) who has been previously convicted twice of violating subdivision (a), (b), (c), or (d) shall be guilty of a misdemeanor.
(f) This section shall not apply to manned hot air balloons, or to balloons used in governmental or scientific research projects.
(g) Electrical corporations shall report to the Public Utilities Commission every other month, from January 1, 1991, until June 30, 1993, on electrical service disruptions caused by balloons constructed of electrically conductive material, including, but not limited to, the location of the service disruption, the composition of the balloon, and the extent of the disruption. The commission shall provide a copy of each electrical corporation's bimonthly report to a representative designated by the metallic balloon manufacturers and shall report the following by December 31, 1993, to the Legislature:
(1) The number of outages reported by each electrical corporation on a monthly basis.
(2) A comparison of the monthly outages reported pursuant to Chapter 1122 of the Statutes of 1988, with the monthly outages reported by each electrical corporation pursuant to this act, reflecting the numerical trend of the outages.

Home